Demolition & Debris · Veteran-owned · Staff-reviewed scope
Selective Bathroom Demolition in Orlando
Controlled removal of approved vanities, fixtures, tile and finishes after required utility preparation, material review and written scope approval.

Request an Estimate · Call (407) 305-4707 · Text Project Photos
Who This Service Is For
- Homeowners planning a bathroom renovation
- Bathroom remodelers and tile installers
- General contractors
- Property managers
- Investors and renovation teams
- Restoration companies
What the Project Can Include
- Vanity and countertop removal
- Prepared sink and faucet removal
- Prepared toilet removal
- Prepared tub or shower-component removal after review
- Wall and floor tile removal
- Approved mirrors, accessories and built-ins
- Bathroom renovation debris loading and hauling
- Final broom cleanup to the written scope
Important Scope Boundaries
- No plumbing, electrical, gas, HVAC or waterproofing trade work unless separately qualified
- No assumption that walls, curbs, platforms or assemblies are nonstructural
- No asbestos, lead, mold, biohazard or other regulated-material handling
- No permit, engineering, waterproofing or code determination by website description
Project and Service Pathways
Vanity and fixture removal
Approved vanities and properly prepared fixtures can be removed under an itemized written scope.
Tile and finish removal
Wall tile, floor tile and selected finishes are reviewed for material, substrate, depth and debris weight.
Tub or shower removal
Eligibility depends on construction, access, utility preparation, waterproofing boundaries and surrounding assemblies.
Moisture or regulated conditions
Suspected mold, asbestos, lead, biohazard or regulated material requires evaluation and handling by the appropriate specialist.
Project Process
- Document fixtures and finishes — Provide photos or plans showing the vanity, toilet, tub or shower, tile, accessories and components that must remain.
- Verify utility and material preparation — JRR reviews required plumbing or electrical preparation, moisture concerns, testing, access and structural boundaries.
- Approve the bathroom scope — The estimate identifies accepted components, protection measures, debris handling, cleanup and excluded trade responsibilities.
- Remove within the written limits — The crew performs only the approved work and stops for leaks, hidden services, suspect materials or unverified assemblies.
What Affects the Estimate
- Fixture type, size and preparation
- Tile area, substrate and removal depth
- Tub, shower and vanity construction
- Utility isolation and hidden-service risk
- Access, floor level and protection requirements
- Debris weight, disposal requirements and loads
Request a bathroom demolition estimate
Send the address, bathroom photos, target fixtures and finishes, access notes and known utility or testing information for review.
Submitting creates an unscheduled estimate request only. It does not schedule or dispatch a crew.
Bathroom Demolition FAQs
What can be included in bathroom demolition?
Approved vanities, countertops, prepared fixtures, tile, selected finishes and debris hauling can be included. The written estimate defines the exact limits.
Do fixtures need to be disconnected first?
Required plumbing or electrical preparation must be completed before removal by an appropriately qualified provider when JRR is not qualified for that trade work.
Can JRR remove a bathtub or shower?
A tub or shower may be considered after construction, access, utilities, waterproofing, surrounding assemblies and material conditions are inspected.
What happens if mold or another suspect material is found?
Work in the affected area must pause until an appropriately qualified professional evaluates and, when required, remediates the condition.